Power factor correction

Cut penalties and relieve your installation.

  • cos φPower factor raised
  • AutoSteps driven by a controller
  • MeasuredSavings verified before / after
cos φ0,96 Capacitor bank P (kW) Before After φ Q (kvar)S (kVA) 0,71Power factor
The challenges

What is at stake

Fixed or automatic capacitor banks to improve the power factor: fewer penalties on the electricity bill and less stress on cables and transformers.

Penalties on the bill

Above a certain threshold, the reactive energy you draw is billed: an expense that produces nothing.

Our answer

A capacitor bank sized to bring the power factor back to the right level.

An overloaded installation

Reactive current needlessly loads transformers and cables, which heat up and reach their limits.

Our answer

Less current in the installation: capacity freed up for new equipment.

Loads that vary

Motors, air conditioning and processes do not run all the time: fixed compensation cannot keep up.

Our answer

Automatic stepped banks driven by a reactive power controller.

Harmonics

Drives and electronics create harmonics that can damage poorly chosen capacitors.

Our answer

Harmonic measurement before the design and detuned banks where necessary.

Architecture

An architecture designed in layers

The capacitor bank supplies on site the reactive energy your motors need: the grid no longer has to carry it, and you no longer have to pay for it.

Every installation is delivered tested, labelled and documented, for simple operation and maintenance.

  1. Layer 01

    Measurements

    Recording of power factor, power and harmonics over several days.

  2. Layer 02

    Controller

    It measures continuously and switches in the steps required.

  3. Layer 03

    Capacitor steps

    Capacitors in steps, with suitable contactors and protection.

  4. Layer 04

    Filtering

    Detuning reactors where the supply is polluted.

  5. Layer 05

    Main switchboard connection

    A protected connection to the main switchboard, as close to the loads as possible.

Services

Our services

01

Power factor measurement and analysis

An on-site measurement campaign and analysis of your electricity bills.

02

Capacitor bank sizing

Reactive power to compensate, number of steps and harmonic protection.

03

Fixed and automatic banks

Fixed compensation for stable loads, automatic for variable loads.

04

Installation and commissioning

Installation, connection, controller setting and verification of the result.

05

Periodic inspection

Checks on capacitors and contactors, replacement of worn parts.

Technologies we master
CapacitorsPower factor controllersCos φ measurements
Method

Our method, step by step

  1. 1

    Bill analysis

    Reactive energy billed and penalties over recent months.

  2. 2

    On-site measurements

    Recording of power and harmonics.

  3. 3

    Sizing

    Rating, steps, type of bank and return on investment.

  4. 4

    Installation

    Installation, connection and controller setting.

  5. 5

    Verification

    Measurements after commissioning and follow-up of the bills.

Standards

Compliance with standards

  • IEC 60831Power capacitors
  • IEC 61921Low-voltage power factor correction banks
  • IEC 61000Electromagnetic compatibility and harmonics
  • IEC 61439Switchboards
Deliverables

What we hand over to you

  • Before / after measurement report
  • Sizing calculation
  • Connection diagram
  • Controller settings
  • Return on investment estimate

Maintenance & 24/7 support

This system can be covered by a preventive and corrective maintenance contract, with priority response on critical sites.

See the plans
FAQ

Your questions

Another question? Our engineers will answer.

How do I know if I pay for reactive energy?

It appears on your electricity bill. Send us your latest bills: we will tell you the amount at stake and the possible savings.

How quickly does the installation pay for itself?

Often within a few months to two years, depending on the penalties paid. We estimate this before any commitment.

Is a fixed bank enough?

For stable loads, yes. If consumption varies during the day, an automatic bank avoids over-compensation.

Let’s talk about your site

A project, an installation to take over or to maintain?

Our engineers study your needs and reply within 48 business hours with initial technical and budget guidance.