An energy bill that weighs heavily
Air conditioning, refrigeration and lighting consume mostly during the day, exactly when the sun produces.
Self-consumption: the energy produced is used directly on site.
Produce part of your energy on site.
Photovoltaic installations for self-consumption or hybrid backup: yield study, sizing, installation, connection and production monitoring.
Air conditioning, refrigeration and lighting consume mostly during the day, exactly when the sun produces.
Self-consumption: the energy produced is used directly on site.
Algeria enjoys one of the best levels of sunshine in the world, still little used by buildings.
A precise yield study based on your site, orientation and shading.
Without storage, a solar installation stops at the same time as the grid.
Hybrid inverters and batteries to back up essential uses.
Heat, wind and dust put panels and structures to the test for decades.
Certified equipment, engineered structures, protection and output monitoring.
The panels produce direct current, the inverter converts it for your equipment, the battery stores the surplus and the grid tops up if needed.
Every installation is delivered tested, labelled and documented, for simple operation and maintenance.
Panels oriented and tilted for the best output, on the roof or on the ground.
Combiner boxes, disconnectors and surge arresters between panels and inverters.
Conversion, battery control and priority management.
Batteries to shift generation and back up essential uses.
Generation, consumption and alarms visible on computer and mobile.
Output estimated month by month, savings and payback period.
Structures engineered for wind and suited to your roof or the ground.
Grid inverters for self-consumption, hybrid inverters for backup.
Capacity sized for your night-time or backup needs.
DC and AC protection, earthing, connection to the switchboard.
Output and alarms viewable remotely, performance report.
Available area, orientation, shading and consumption.
Estimated output, savings and return on investment.
Structures, panels, inverters, batteries and protection.
Measurements, configuration and output checks.
Remote monitoring, cleaning and maintenance.
This system can be covered by a preventive and corrective maintenance contract, with priority response on critical sites.
See the plansWith a hybrid inverter and batteries, yes: essential uses stay powered. Without storage, the installation shuts down for safety.
Allow roughly 5 to 6 m² per kilowatt-peak installed, depending on the panels and the layout.
Very little: regular cleaning, especially in dusty areas, and checks of the protection and connections.
Our engineers study your needs and reply within 48 business hours with initial technical and budget guidance.